Customization: | Available |
---|---|
After-sales Service: | Free Accessories |
Tank Material: | HDPE |
Still deciding? Get samples of US$ 42/Piece
Request Sample
|
Suppliers with verified business licenses
No | Name | Product Description |
1 | Product | Concealed cistern |
2 | Model No. | 024A |
3 | Tank color | Blue&White |
4 | Installation | Covert |
5 | Frame material | High Class Full metal frame |
6 | Tank body material | HDPE plastic body |
7 | Whether there are bubbles | YES |
8 | Tank thickness | 105mm thick tank body |
9 | Flush volume | 3L&6L |
10 | Connectors | With copper connector |
11 | Flush pipe | 90mm |
12 | Packaging cartons | Kraft paper 5-ply |
13 | Packaging details | Carton packaging |
14 | Certification | CE |
15 | Package size | 542mm x 105mm x 1100mm |
16 | OEM | YES |
17 | Gross weight | 13.8kg |
18 | Delivery time | 25 days |
19 | Customizable | YES |
20 | Total employees | 125 |
1. Who are we?
Our headquarters is located in Shunde , Foshan , Guangdong Province, specializing in the production and sales of sanitary products, products have obtained CE certification, the production factory has passed ISO9001.
Products are sold to Germany, Britain, France, Switzerland, Russia, the Middle East and other regions
2. How can we guarantee quality?
All our products have been fully inspected, from the production of the first process to the shipment, a total of more than 10 tests; Products are regularly tested by third-party testing institutions. Free 1% of after-sale parts per shipment.
3. What can you buy from us?
Concealed water tank, wall mounted water tank, toilet, electric towel rack, etc,Flush Cistern.
4. What advantage do we have?
We have our own research and development team, which can design and solve according to the requirements of customers to improve the competitiveness of our customers.
5. What trading methods are acceptable to us?
T/T,L/C,D/P
6. What's the warranty term?
Water parts warranty for 3 years, iron frame warranty for 5 years, tank box warranty for 10 years.
7.How long is the production cycle?
25 days after deposit payment.